<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects Archives | Jr Roofing Contracts</title>
	<atom:link href="https://jrroofingcontracts.com/category/projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://jrroofingcontracts.com/category/projects/</link>
	<description>Quality Roofing Service in the South East of England</description>
	<lastBuildDate>Tue, 20 Jan 2026 12:31:35 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://jrroofingcontracts.com/wp-content/uploads/2025/10/cropped-favicon-32x32.png</url>
	<title>Projects Archives | Jr Roofing Contracts</title>
	<link>https://jrroofingcontracts.com/category/projects/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Pitched Roof for 67 plots Oxford House, Aylesbury</title>
		<link>https://jrroofingcontracts.com/pitched-roof-for-67-plotsoxford-house-aylesbury/</link>
					<comments>https://jrroofingcontracts.com/pitched-roof-for-67-plotsoxford-house-aylesbury/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 17 Dec 2025 10:40:23 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=647</guid>

					<description><![CDATA[<p>Client: MCR PropertyLocation: Oxford House, AylesburyProject Duration: 30 weeksScope of Works: Installation of interlocking Marley tiles, loft insulation, felt and battens, Velux windows, lead dormers, and two-layer felt porch roofsValue: £320,000.00 BackgroundOxford House in Aylesbury required a complete pitched roof renewal to improve thermal performance, weather resistance, and overall aesthetic appeal. JR Roofing Contracts was [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/pitched-roof-for-67-plotsoxford-house-aylesbury/">Pitched Roof for 67 plots Oxford House, Aylesbury</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client:</strong> MCR Property<br><strong>Location:</strong> Oxford House, Aylesbury<br><strong>Project Duration:</strong> 30 weeks<br><strong>Scope of Works: </strong>Installation of interlocking Marley tiles, loft insulation, felt and battens, Velux windows, lead dormers, and two-layer felt porch roofs<br><strong>Value:</strong> £320,000.00</p>



<p><strong>Background</strong><br>Oxford House in Aylesbury required a complete pitched roof renewal to improve thermal performance, weather resistance, and overall aesthetic appeal. JR Roofing Contracts was appointed by MCR Property to deliver a high-quality installation that would enhance both the function and appearance of the building while meeting all current building regulations.</p>



<p><strong>Challenges</strong><br><strong>Complex roof features:</strong> Incorporating dormers, Velux windows, and porch roofs within the programmed required careful planning and sequencing.<br><strong>Occupied building:</strong> Works were undertaken while the building remained in use, requiring strict safety measures and minimal disruption.<br><strong>Weather dependency:</strong> Roofing operations were coordinated to mitigate risks from adverse weather, ensuring watertight protection throughout.</p>



<p><strong>Solution</strong></p>



<ul class="wp-block-list">
<li>Pitched roof installation: Fitted interlocking Marley tiles for durability, weather resistance, and a modern, uniform finish.</li>



<li>Thermal upgrade: Installed loft insulation to enhance the building’s energy efficiency and occupant comfort.</li>



<li>Structural preparation: Replaced felt and battens across the roof to provide a solid, secure base for the new tiles.</li>



<li>Feature works: Installed Velux windows for natural light, constructed lead dormers with precision detailing, and completed two-layer felt coverings to the porch roofs for added protection.</li>



<li>Quality control: All works were carried out to current British Standards, with continuous supervision to maintain high workmanship standards.</li>
</ul>



<p><strong>Results</strong><br>The project was completed to specification, on time, and with zero defects. The new roof offers significantly improved insulation, weatherproofing, and aesthetic appeal, ensuring long-term performance and reduced maintenance requirements.</p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img fetchpriority="high" decoding="async" width="681" height="907" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3.png" alt="" class="wp-image-650" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3.png 681w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-225x300.png 225w" sizes="(max-width: 681px) 100vw, 681px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img decoding="async" width="681" height="907" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5.png" alt="" class="wp-image-652" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5.png 681w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-225x300.png 225w" sizes="(max-width: 681px) 100vw, 681px" /></figure>
</div>
</div>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img decoding="async" width="917" height="688" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1.png" alt="" class="wp-image-649" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1.png 917w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-300x225.png 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-768x576.png 768w" sizes="(max-width: 917px) 100vw, 917px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="853" height="681" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4.png" alt="" class="wp-image-651" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4.png 853w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-300x240.png 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-768x613.png 768w" sizes="(max-width: 853px) 100vw, 853px" /></figure>
</div>
</div>
<p>The post <a href="https://jrroofingcontracts.com/pitched-roof-for-67-plotsoxford-house-aylesbury/">Pitched Roof for 67 plots Oxford House, Aylesbury</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/pitched-roof-for-67-plotsoxford-house-aylesbury/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Roof Refurbishment Prince William School, Oundle</title>
		<link>https://jrroofingcontracts.com/roof-refurbishment-prince-william-school-oundle/</link>
					<comments>https://jrroofingcontracts.com/roof-refurbishment-prince-william-school-oundle/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 16 Dec 2025 17:28:05 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=640</guid>

					<description><![CDATA[<p>Client: East Midlands Academy TrustLocation: Prince William School, OundleProject Duration: 8 weeksScope of Works: Full refurbishment of the Art, Design &#38; Technology block roof, including insulation upgrade, waterproofing system installation, detailing, and encapsulation of existing metal roof areasValue: £331,000.00 BackgroundPrince William School’s Art, Design &#38; Technology block required a complete roof refurbishment to resolve weathering [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/roof-refurbishment-prince-william-school-oundle/">Roof Refurbishment Prince William School, Oundle</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client:</strong> East Midlands Academy Trust<br><strong>Location:</strong> Prince William School, OundleProject <br><strong>Duration:</strong> 8 weeks<br><strong>Scope of Works:</strong> Full refurbishment of the Art, Design &amp; Technology block roof, including insulation upgrade, waterproofing system installation, detailing, and encapsulation of existing metal roof areas<br><strong>Value:</strong> £331,000.00</p>



<p><strong>Background</strong><br>Prince William School’s Art, Design &amp; Technology block required a complete roof refurbishment to resolve weathering issues, improve energy efficiency, and extend the roof’s lifespan. JR Roofing Contracts was appointed to deliver the works using the Garland system, ensuring a robust, long-lasting finish while the school remained fully operational.</p>



<p><strong>Challenges</strong><br><strong>Occupied school environment: </strong>Works were undertaken during term time, requiring meticulous planning to ensure safety, minimal disruption, and compliance with safeguarding policies.<br><strong>Safeguarding requirements:</strong> All operatives held valid DBS checks and were briefed on appropriate conduct in a live school environment.<br><strong>Multiple roof types:</strong> The project involved both flat and metal roof areas, requiring tailored application methods for each.<br><strong>Weather sensitivity:</strong> Summer heat and variable conditions demanded careful scheduling for optimal installation and adhesion.</p>



<p></p>



<p><strong>Solution</strong></p>



<ul class="wp-block-list">
<li>Garland system installation: Applied a high-performance waterproofing membrane across the roof field, gutters, and details, ensuring continuous lap security.</li>



<li>Metal roof encapsulation: Encased existing metal roof areas within the Garland system for added durability and protection.</li>



<li>Detailing: Installed new vents, lead collars for pipe penetrations, GRP trims, ridge capping&#8217;s, and precise skirting flashings to ensure complete watertight integrity.</li>



<li>Safeguarding coordination: Maintained strict segregation of work areas, adhered to school safeguarding protocols, and ensured all staff conducted themselves with professionalism and respect for the school environment.</li>



<li>Quality assurance: Worked closely with Garland technical inspectors to maintain exceptional workmanship standards.</li>
</ul>



<p><strong>Results</strong><br>The project was delivered to specification, signed off without defects, and received outstanding feedback from the client for the quality of the works, professional conduct, and minimal disruption to school operations. The new roofing system provides improved energy performance, extended service life, and reduced maintenance needs.</p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="768" height="537" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/2-3.jpg" alt="" class="wp-image-644" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/2-3.jpg 768w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/2-3-300x210.jpg 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="805" height="520" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-1.jpg" alt="" class="wp-image-641" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-1.jpg 805w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-1-300x194.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-1-768x496.jpg 768w" sizes="(max-width: 805px) 100vw, 805px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="768" height="520" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-2.jpg" alt="" class="wp-image-642" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-2.jpg 768w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-2-300x203.jpg 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="805" height="542" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-2.jpg" alt="" class="wp-image-643" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-2.jpg 805w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-2-300x202.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-2-768x517.jpg 768w" sizes="(max-width: 805px) 100vw, 805px" /></figure>
</div>
</div>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow"></div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow"></div>
</div>
<p>The post <a href="https://jrroofingcontracts.com/roof-refurbishment-prince-william-school-oundle/">Roof Refurbishment Prince William School, Oundle</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/roof-refurbishment-prince-william-school-oundle/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Asbestos Strip &#038; Cladding Replacement – Denbigh House, Milton Keynes</title>
		<link>https://jrroofingcontracts.com/asbestos-strip-cladding-replacement-denbigh-house-milton-keynes/</link>
					<comments>https://jrroofingcontracts.com/asbestos-strip-cladding-replacement-denbigh-house-milton-keynes/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 16 Dec 2025 17:15:49 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=635</guid>

					<description><![CDATA[<p>Client: PCILocation: Denbigh House, Milton KeynesProject Duration:16 weeksScope of Works: Asbestos stripping, new composite panel installation, tank house cladding replacement, multiple flat roof installationsValue: £540,000.00 BackgroundDenbigh House required urgent removal of hazardous asbestos roofing materials alongside comprehensive roof and cladding upgrades. JR Roofing Contracts was engaged to carry out a complex refurbishment involving asbestos removal, [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/asbestos-strip-cladding-replacement-denbigh-house-milton-keynes/">Asbestos Strip &amp; Cladding Replacement – Denbigh House, Milton Keynes</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client:</strong> PCI<br><strong>Location:</strong> Denbigh House, Milton KeynesProject <br><strong>Duration:</strong>16 weeks<br><strong>Scope of Works:</strong> Asbestos stripping, new composite panel installation, tank house cladding replacement, multiple flat roof installations<br><strong>Value:</strong> £540,000.00</p>



<p><strong>Background<br></strong>Denbigh House required urgent removal of hazardous asbestos roofing materials alongside comprehensive roof and cladding upgrades. JR Roofing Contracts was engaged to carry out a complex refurbishment involving asbestos removal, installation of new composite panels, and flat roofing across several buildings all while maintaining safety on a live workshop site.</p>



<p><strong>Challenges<br>Hazardous materials:</strong> Asbestos sheets required careful removal under strict health and safety regulations.<br><strong>Live site:</strong> Works were undertaken on an operational site with active workshops, necessitating close coordination with the site and project teams to minimise disruption and ensure safety.<br><strong>Complex scope:</strong> Included multiple flat roofs, tank house cladding, and composite panel installation, all requiring specialist materials and precise installation.</p>



<p><strong>Solution</strong></p>



<ul class="wp-block-list">
<li>Safety measures:Installed safety netting beneath the existing roof before commencing asbestos stripping to protect workers and occupants below.</li>



<li>Asbestos removal:Conducted careful, controlled asbestos sheet removal by trained personnel following all regulatory protocols.</li>



<li>Materials:Installed high-performance composite panels, liquid coating systems, Garland felt roofing, and cut-to-fall insulation to ensure durable and thermally efficient result</li>



<li>Project management:Maintained close liaison with the site and project teams to coordinate works and maintain safe conditions throughout the 16-week programme.</li>
</ul>



<p><strong>Results</strong><br>Complete removal of hazardous asbestos roofing materials, eliminating health risks. New roofing and cladding systems installed with a 25-year manufacturer’s guarantee. Significant thermal performance improvements through upgraded insulation and roofing materials.</p>



<p>Zero safety incidents and minimal disruption on a live working site.</p>


<div class="wp-block-image">
<figure class="aligncenter size-full"><img loading="lazy" decoding="async" width="1526" height="859" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-1.jpg" alt="" class="wp-image-637" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-1.jpg 1526w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-1-300x169.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-1-1024x576.jpg 1024w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-1-768x432.jpg 768w" sizes="(max-width: 1526px) 100vw, 1526px" /></figure>
</div>


<p><br></p>
<p>The post <a href="https://jrroofingcontracts.com/asbestos-strip-cladding-replacement-denbigh-house-milton-keynes/">Asbestos Strip &amp; Cladding Replacement – Denbigh House, Milton Keynes</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/asbestos-strip-cladding-replacement-denbigh-house-milton-keynes/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Flat &#038; Pitched Roof Replacement Witney Campus, Oxfordshire</title>
		<link>https://jrroofingcontracts.com/flat-pitched-roof-replacementwitney-campus-oxfordshire/</link>
					<comments>https://jrroofingcontracts.com/flat-pitched-roof-replacementwitney-campus-oxfordshire/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 16 Dec 2025 16:59:25 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=625</guid>

					<description><![CDATA[<p>Client: Abingdon &#38; Witney CollegeLocation: Witney Campus, OxfordshireProject Duration: 8 weeksScope of Works: Flat roof replacement with thermal upgrade, full pitched roofreplacement including new hand-cut roof and associated stoneworkValue: £173,000.00 BackgroundAbingdon &#38; Witney College required essential roofing works to improve the performance and longevity of its Witney Campus buildings. The project involved upgrading the flat [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/flat-pitched-roof-replacementwitney-campus-oxfordshire/">Flat &amp; Pitched Roof Replacement Witney Campus, Oxfordshire</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client:</strong> Abingdon &amp; Witney College<br><strong>Location:</strong> Witney Campus, Oxfordshire<br><strong>Project Duration:</strong> 8 weeks<br><strong>Scope of Works:</strong> Flat roof replacement with thermal upgrade, full pitched roof<br>replacement including new hand-cut roof and associated stonework<br><strong>Value:</strong> £173,000.00</p>



<p><strong>Background</strong><br>Abingdon &amp; Witney College required essential roofing works to improve the performance and longevity of its Witney Campus buildings. The project involved upgrading the flat roofs to meet modern thermal standards and replacing a pitched roof where significant timber decay was discovered. JR Roofing Contracts was appointed to carry out the works, ensuring minimal disruption to the college’s day-to-day activities.</p>



<p><strong>Challenges</strong><br><strong>Unexpected structural issues:</strong> During works, significant timber rot was found in the pitched roof, necessitating a full hand-cut roof replacement.<br><strong>Time sensitivity:<br></strong>The new hand-cut roof was installed within seven days of discovery to prevent further deterioration and keep the project on track.</p>



<p>Solution</p>



<ul class="wp-block-list">
<li>Flat roof:Installed Garland UK felt system with VCL, tapered insulation, and recovery board to achieve upgraded thermal performance.</li>



<li>Pitched roof:Constructed a bespoke hand-cut timber roof and carried out associated stonework to match the existing building style.</li>



<li>Materials:Installed composite slates to blend seamlessly with the campus’s existing architecture.</li>



<li>Safety &amp; access:Erected a temporary roof scaffold to protect the interior during timber replacement, ensuring no water ingress and maintaining safe working conditions.</li>
</ul>



<p><strong>Results<br></strong>Thermal efficiency of the flat roof improved significantly, reducing future heating costs. Heritage appearance maintained through careful material selection and stonework detailing. No disruption to college operations, with works carried out safely during term time.</p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="812" height="608" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-1.jpg" alt="" class="wp-image-628" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-1.jpg 812w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-1-300x225.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-1-768x575.jpg 768w" sizes="(max-width: 812px) 100vw, 812px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="812" height="609" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-1.jpg" alt="" class="wp-image-631" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-1.jpg 812w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-1-300x225.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/4-1-768x576.jpg 768w" sizes="(max-width: 812px) 100vw, 812px" /></figure>
</div>
</div>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="677" height="903" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5.jpg" alt="" class="wp-image-630" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/5.jpg 677w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/5-225x300.jpg 225w" sizes="(max-width: 677px) 100vw, 677px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="677" height="903" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/6.jpg" alt="" class="wp-image-629" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/6.jpg 677w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/6-225x300.jpg 225w" sizes="(max-width: 677px) 100vw, 677px" /></figure>
</div>
</div>
<p>The post <a href="https://jrroofingcontracts.com/flat-pitched-roof-replacementwitney-campus-oxfordshire/">Flat &amp; Pitched Roof Replacement Witney Campus, Oxfordshire</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/flat-pitched-roof-replacementwitney-campus-oxfordshire/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Heritage Roof Restoration Rock House, Stamford</title>
		<link>https://jrroofingcontracts.com/heritage-roof-restoration-rock-house-stamford/</link>
					<comments>https://jrroofingcontracts.com/heritage-roof-restoration-rock-house-stamford/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 17:28:57 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=600</guid>

					<description><![CDATA[<p>Client: Linx ConstructionLocation: Rock House, StamfordProject Duration: 10 weeksScope of Works: Full pitched roof replacement, timber and lead renewal, heritage-compliant restorationValue: £210,000.00 BackgroundRock House is a prominent heritage property in Stamford, requiring specialist roofing works to restore and protect the building in line with British heritage standards. JR Roofing Contracts was appointed by Linx Construction [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/heritage-roof-restoration-rock-house-stamford/">Heritage Roof Restoration Rock House, Stamford</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client:</strong> Linx Construction<br><strong>Location:</strong> Rock House, Stamford<br><strong>Project Duration:</strong> 10 weeks<br><strong>Scope of Works:</strong> Full pitched roof replacement, timber and lead renewal, heritage-compliant restoration<br><strong>Value: </strong>£210,000.00</p>



<p><strong>Background<br></strong>Rock House is a prominent heritage property in Stamford, requiring specialist roofing works to restore and protect the building in line with British heritage standards. JR Roofing Contracts was appointed by Linx Construction to carry out a complete roof refurbishment, including lead and timber replacement, using authentic materials to match the building’s historic character.</p>



<p><strong>Challenges<br>Heritage compliance:</strong> All works had to meet strict British Heritage and British Standards requirements to<br>preserve the building’s architectural integrity.</p>



<p><strong>Structural deterioration:</strong> Significant woodworm damage was found in the existing roof timbers,<br>necessitating careful removal and replacement without compromising the structure.</p>



<p><strong>Bespoke detailing:</strong> Original fascia mouldings were no longer available and had to be replicated to match the existing profiles exactly.</p>



<p><strong>Solution</strong><br><strong>Specialist materials:</strong> Installed Welsh blue slate sourced directly from the quarry to ensure authenticity and<br>longevity.</p>



<ul class="wp-block-list">
<li><strong>Leadwork:</strong> Applied Code 7 lead to flat roofs and guttering, fabricated and installed by our in-house<br>leadwork specialists.</li>



<li><strong>Timber replacement:</strong> Carefully removed and replaced woodworm-affected timbers with treated,<br>heritage-grade timber to maintain structural integrity.</li>



<li><strong>Bespoke fascia mouldings: </strong>Commissioned custom mouldings to replicate the original designs,<br>maintaining the building’s historic appearance.</li>



<li><strong>Compliance:</strong> All works completed in accordance with British Heritage and British Standards guidance. </li>
</ul>



<p>Results Project delivered on time and within budget. Roof lifespan extended by 60+ years with minimal maintenance requirements. Authentic materials and detailing preserved the property’s heritage value. Client satisfaction achieved through attention to detail and high-quality craftsmanship.</p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="970" height="546" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/2.jpg" alt="" class="wp-image-604" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/2.jpg 970w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/2-300x169.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/2-768x432.jpg 768w" sizes="(max-width: 970px) 100vw, 970px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="970" height="546" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3.jpg" alt="" class="wp-image-603" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/3.jpg 970w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-300x169.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/3-768x432.jpg 768w" sizes="(max-width: 970px) 100vw, 970px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="970" height="547" src="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1.jpg" alt="" class="wp-image-601" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/12/1.jpg 970w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-300x169.jpg 300w, https://jrroofingcontracts.com/wp-content/uploads/2025/12/1-768x433.jpg 768w" sizes="(max-width: 970px) 100vw, 970px" /></figure>
</div>
</div>
<p>The post <a href="https://jrroofingcontracts.com/heritage-roof-restoration-rock-house-stamford/">Heritage Roof Restoration Rock House, Stamford</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/heritage-roof-restoration-rock-house-stamford/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Heatherbrook Primary School</title>
		<link>https://jrroofingcontracts.com/heatherbrook-primary-school/</link>
					<comments>https://jrroofingcontracts.com/heatherbrook-primary-school/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 15 Nov 2025 12:00:00 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Roofing]]></category>
		<guid isPermaLink="false">https://jrroofingcontracts.ts4.link/?p=411</guid>

					<description><![CDATA[<p>Here we were tasked up grading the schools u-values and fix an ongoing leaking roof.&#160; An overlay was carried on the larger roof section with a 3 layer Garland system achieving part L regulations and a new 25 year single point guarantee. We also installed a fall arrest system meaning the roof can be safely [&#8230;]</p>
<p>The post <a href="https://jrroofingcontracts.com/heatherbrook-primary-school/">Heatherbrook Primary School</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Here we were tasked up grading the schools u-values and fix an ongoing leaking roof.&nbsp;</p>



<p>An overlay was carried on the larger roof section with a 3 layer Garland system achieving part L regulations and a new 25 year single point guarantee. We also installed a fall arrest system meaning the roof can be safely maintained. </p>



<p>The smaller roof was fully stripped due to years of water ingress. Here we stripped the roof, repaired any rotten timbers and again installed a 3 layer insulated Garland system achieving the required u-values and a 25 year single point guarentee. Hand rail was also installed for Maintenace.</p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" src="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-3-768x1024.jpg" alt="" class="wp-image-412" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-3-768x1024.jpg 768w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-3-225x300.jpg 225w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-3-1152x1536.jpg 1152w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-3.jpg 1536w" sizes="(max-width: 768px) 100vw, 768px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" src="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-21-768x1024.jpg" alt="" class="wp-image-414" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-21-768x1024.jpg 768w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-21-225x300.jpg 225w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-21-1152x1536.jpg 1152w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-21.jpg 1536w" sizes="(max-width: 768px) 100vw, 768px" /></figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" src="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-1-2-1-768x1024.jpg" alt="" class="wp-image-415" srcset="https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-1-2-1-768x1024.jpg 768w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-1-2-1-225x300.jpg 225w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-1-2-1-1152x1536.jpg 1152w, https://jrroofingcontracts.com/wp-content/uploads/2025/11/unnamed-1-2-1.jpg 1536w" sizes="(max-width: 768px) 100vw, 768px" /></figure>
</div>
</div>
<p>The post <a href="https://jrroofingcontracts.com/heatherbrook-primary-school/">Heatherbrook Primary School</a> appeared first on <a href="https://jrroofingcontracts.com">Jr Roofing Contracts</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://jrroofingcontracts.com/heatherbrook-primary-school/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
